Çay HES Projesi

Projects

Giresun

The Çay Regulator, located in Espiye district of Giresun province, was designed on the Özlüce Stream and Karadona Stream in Espiye district. Construction of our power plant, with a capacity of 10.44 MWm / 10.05 MWe, began in 2012, with an annual electricity generation plan of 39.98 GWh. Great care is taken not to harm the environment and the local community during the construction of the facility, which includes a 5,073-meter-long transmission tunnel.

Çay HES Projesi — image 1Çay HES Projesi — image 2Çay HES Projesi — image 3Çay HES Projesi — image 4Çay HES Projesi — image 5Çay HES Projesi — image 6Çay HES Projesi — image 7Çay HES Projesi — image 8Çay HES Projesi — image 9Çay HES Projesi — image 10Çay HES Projesi — image 11Çay HES Projesi — image 12